Project Overview:
Configuration of a central control computer system, 8 loading arms (truck loading positions), and automated loading equipment.
Project Background:
This is a new project. Previously, loading operations were conducted entirely manually, resulting in numerous safety hazards and low production efficiency.
Products Loaded:
Gasoline, Diesel, Jet Fuel.
Key Benefits:
- Enhanced production management standards and loading automation levels.
- Improved filling efficiency.
- Completely eliminated (100%) safety hazards during the loading process.
- Paved the way for long-term cooperation.





