The batch controller is a wall-mounted or cabinet-type structure with an industrial-grade intelligent controller PLC.
The batch controller is a wall-mounted or cabinet-type structure with an industrial-grade intelligent controller PLC.
Batch controller with SIEMENS PLC module function:Set up the loading capacity, press the start button, automatically according to the set of the order to open the valve and pump, start loading. Achieve the set of advance, the automatic closing valves and pumps, complete quantitative loading operation.
Real time data acquisition, testing and display of the amount of the set, instantaneous flow, loading and accumulation, temperature, density, pressure and other data, real-time processing and storage of data.
Real-time interlocking static electricity, overflow alarm signal, detection alarm signal, the control device immediately stop the pump, off valve, and output alarm.
We have got the ATEX and CE certificate,and we have sold it to many countries ,such as Thailand ,Pakistan,Bangladesh,Mongolia,Gana etc..
Features:1. One AWZ Loading Controller can control 1~4 loading position at same time.
2. AWZ Loading controller can control ratio of medium loading & offloading.
3. Adjust volume based on differences of density and volume which caused by temperature. There are hand-actuated and automatic ways.
4. Static grounding protection, AWZ Loading Controller can assure safety by stopping system operation once static wire don’t grounded.
5. Oil Spilling protection, AWZ Loading Controller can automatically turn valve and pump off once spilled oil been detected.
Our batch controller have got the ATEX and CE certificate.
| Batch controller with cast aluminum housing | Batch controller with stainless steel housing | Non-Ex batch controller |
![]() |
![]() |
![]() |
| Certificates:
ATEX explosion-proof certification SIL safety certification |
Certificates:
ATEX explosion-proof certification SIL safety certification |
Customized |
| Name | Batch Controller |
| Control the number of loading arm | 1-4 loading arm |
| Power supply | 110-240VAC,2A,50Hz |
| LCD | High brightness STN liquid crystal display module |
| Material | Carbon steel,stainless steel |
| IC card function | With IC card operation or other language |
| Keyboard input | 24keys,English menu operation or other language |
| Equipment self-test | Automatically detect device operating status and remotely monitor |
| Flow signal | Can be connected to 4 groups of 0-10KHz pulse input or two 4-20mA analog signal |
| Valve position signal | Up to 12 switch contact valve can be connected to his signal |
| Relay output | AC220V,SA,can control 10 valve or pumps(expandable more) |
| PID adjustment output | AO regulated output for adjustment of at least one PID loop |
| Operation mode | Continuous operation 24 hours a day, can be operated locally or remotely |
| Working temperature | -40℃~70℃ |
| Storage temperature | -30℃~80℃ |
| Relative humidity | 0-90% |
| Communication interface | RS232,RS485 or RJ45 |
| Communication protocol | Modbus RTU(serial port),TCP/IP(Ethernet) |
| Communication rate | 10Mbps(Ethernet),600-115200 bps(serial port) |
| Mean time between failures | MTBF>100000hours(11years) |
| Explosion-proof sign | ExdllBT6(IP65),ATEX Certificate |
| Installation | Wall-mounted/cabinet type |
| Dimension | 300(length)×400(height)×150(deep) |
To enhance packaging quality, strengthen packaging management, and prevent product loss or damage during transit resulting from packaging-related issues, this Export Packaging Specification has been specifically formulated.
This specification applies to the packaging of all products exported by this Company.
| Requirement | Responsible Dept. | |
| Before Packaging | Confirm that the product has been tested and is free of defects. Confirm that the product’s exterior is clean and free of stains, standing water, or similar issues. | Quality Dept. |
| Product Packaging | 1. Skid-mounted and Containerized Packaging: A three-layer packaging system—comprising inner, intermediate, and outer packaging—is required. The packaging must be securely fastened and stable, providing effective protection for the product. a. Individual instruments on the skid must be protected with bubble wrap and tightly bound with stretch film. b. The entire skid must be protected with bubble wrap and tightly bound with stretch film. . Containers equipped with racks must be securely fastened using strapping bands. d. Loose piping must be wrapped in protective fabric to prevent paint damage from impact, and then placed onto a dedicated packing rack. Legend 2. Individual Packaging A three-layer packaging system—comprising inner, intermediate, and outer packaging—is required. The packaging must be securely fastened and stable, providing effective protection for the product. Inner Packaging: Foam wrap must be used to fully enclose the items, ensuring that no direct collision or friction occurs between products or between the products and the carton. Each individual item must bear both Chinese and English labels to facilitate inventory verification by the customer. Intermediate Packaging: Packed in cartons. Outer Packaging: Wooden crate packaging. The materials used must consist of plywood crates (fumigation-free) reinforced with steel strips. Any remaining space inside the box must be filled with cushioning material. For heavier products, particular attention should be paid to packaging strength to prevent damage during transit. | Production Dept / Warehousing & Logistics Dept |
| packaging | 1. Steel strips / wide wooden slats to wrap the 8 legs. Note: Wooden slat width: mm; thickness: mm. 2. 6–8 reinforcement points inside the box. 3. For any face exceeding 2 CBM, cross-bar or I-beam steel reinforcement is required. Note: The spacing between cross-bars/I-beams must be less than or equal to mm. 4. All packaging must include forklift access points to facilitate loading and unloading. 5. Packaging must be designed based on the dimensions of the container; under no circumstances should it exceed the container’s length, width, or height. | Warehousing & Logistics Dept |
| Shipping Mark | In accordance with the accompanying documentation, affix the shipping marks and packing lists to the front and sides, respectively . | Warehousing & Logistics Dept |
| Packaging Markings | Fragile, Keep Dry, This Side Up. Labels must be clear and securely affixed. | Warehousing & Logistics Dept |
| Instruction Manual placement | You must include: an instruction manual (either entirely in English or bilingual English-Chinese), a Certificate of Conformity, and a test report. (Note: No documents may be submitted exclusively in Chinese.) | Quality Dept |
| Take photos for the archive. | The packaging process must be documented via photographs or video recordings, and relevant information retained. All photographic and video files must be date-stamped and subsequently archived. | Warehousing & Logistics Dept |












Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.